Level Crossing Work 4

The concrete has now been poured for the level crossing.

As mentioned previously, this area was relaid with concrete sleepers as wooden ones do degrade and can rot over time. Next we should be seeing work done on the approaches, and the laying of the roadway around the back of the shed.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.