Riverbank Subsidence and Repairs

The phrase ‘ship shape and Bristol fashion’ refers to the high tidal reach of the River Avon in Bristol, where ships would have to be strong to withstand being on the riverbed every 4 hours.
During the harsh tides this spring, the banks of the New Cut between Vauxhall Bridge and the Create Centre sagged a bit, requiring this section to be closed while repairs were carried out.

This photo shows the ‘sag’ in the track.
IMG_3734

The rails in this section were duly lifted, and the sleepers repositioned to form a ramp for construction equipment to get in.
IMG_4430

IMG_4434

IMG_4429
IMG_4539

Within two weeks the operation was completed, allowing ‘Henbury’ to propel the first passenger trains across the repaired section. A speed limit of 5mph is currently in place here.
IMG_4691

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.