Last Operating Weekend of 2014

This Saturday and Sunday are the last two days of operation on the BHR for the 2014 season, and possibly the last services to travel to Butterfly Junction in its present form before the remodelling in anticipation of the Metrobus route construction.

Come down and take a ride!

Whapping Wharf Development

As the housing at Sugar Quay is going up…
IMG_4808

… Other buildings are coming down. The former coal office (Latterly the office for the car park managers) has been demolished, along with the partially-collapsed roof of the building on the right.
IMG_4809

See this photo from February 2013 for a comparison

Over on the shed road, the old goods platform has been renovated and the entire wall treated to new paint. The remnants of the platform roof have been removed.

IMG_4776

IMG_4777

IMG_4774

Compare this last photo with the view back in 2009

Likewise, this view back toward the shed has changed so much, and is due to change again, as the access road is to be built and will need to cross the two yard tracks.

IMG_4779

This shot of the Ruston, taken from the same location, is about a year old.

Riverbank Subsidence and Repairs

The phrase ‘ship shape and Bristol fashion’ refers to the high tidal reach of the River Avon in Bristol, where ships would have to be strong to withstand being on the riverbed every 4 hours.
During the harsh tides this spring, the banks of the New Cut between Vauxhall Bridge and the Create Centre sagged a bit, requiring this section to be closed while repairs were carried out.

This photo shows the ‘sag’ in the track.
IMG_3734

The rails in this section were duly lifted, and the sleepers repositioned to form a ramp for construction equipment to get in.
IMG_4430

IMG_4434

IMG_4429
IMG_4539

Within two weeks the operation was completed, allowing ‘Henbury’ to propel the first passenger trains across the repaired section. A speed limit of 5mph is currently in place here.
IMG_4691

All change at Butterfly Junction

The track gangs (Usually a team of no more than 6 people) have been extremely busy in modifying the layout at Butterfly Junction.

This was the view today – the line through the station has been lifted, as has the loop, and the sleepers from the Ashton Meadows Spur have been recovered.

Perhaps aptly, the station information board is rather lopsided.
IMG_3093

In the shadow of the tobacco bond warehouses, the crane lifts the last few remaining rails from the station area.
IMG_3092

Larry the loader assists
IMG_3090

The foreground is where the spur to Ashton Meadows used to run – this is planned to form part of the Metrobus route
IMG_3089

Just around the corner, the new shed and yard is taking shape. Compare these photos to those taken in January, another set of points has been laid on the approach to the Barn, which is already half assembled.

IMG_3082

IMG_3083

IMG_3084

IMG_3085

IMG_3086

Winter Progress, or ‘Where’s the Point?’

Down at Butterfly Junction on a windy January day, the simplification of the track layout has seen the point to Ashton Swing Bridge removed…

IMG_2769

IMG_2770

IMG_2771

IMG_2773

Meanwhile, round the bend, the pointwork salvaged from defunct lines is being relaid at the end of Cumberland Road.
The self-propelled crane was in the process of bringing rail down from the junction….

IMG_2777

IMG_2778

… allowing the track layout to take shape before rain stopped play for the day. The area in the foreground is planned to become the entrance to the rebuilt ‘barn’ building.

IMG_2781