Pyronaut in Action (again!)

The 93 year-old fire float ‘PYRONAUT’, one of the working exhibits at M Shed, was called back into action on Friday 26th June 2026 to help cool down the large swing bridge at Cumberland Basin.
The extreme heat wave has been causing the bridge girders to expand and stop it from being able to open and close, so a dose of harbour water is handy to help cool the steel down.
Coincidentally I had a day off and Bob gave me a heads-up about this operation, so I was able to cycle out and catch ‘Pyronaut’ passing Albion Dockyard and capture the event on video.
Katie also came along and took some cracking photos-see below.

All change at Butterfly Junction

The track gangs (Usually a team of no more than 6 people) have been extremely busy in modifying the layout at Butterfly Junction.

This was the view today – the line through the station has been lifted, as has the loop, and the sleepers from the Ashton Meadows Spur have been recovered.

Perhaps aptly, the station information board is rather lopsided.
IMG_3093

In the shadow of the tobacco bond warehouses, the crane lifts the last few remaining rails from the station area.
IMG_3092

Larry the loader assists
IMG_3090

The foreground is where the spur to Ashton Meadows used to run – this is planned to form part of the Metrobus route
IMG_3089

Just around the corner, the new shed and yard is taking shape. Compare these photos to those taken in January, another set of points has been laid on the approach to the Barn, which is already half assembled.

IMG_3082

IMG_3083

IMG_3084

IMG_3085

IMG_3086

Winter Progress, or ‘Where’s the Point?’

Down at Butterfly Junction on a windy January day, the simplification of the track layout has seen the point to Ashton Swing Bridge removed…

IMG_2769

IMG_2770

IMG_2771

IMG_2773

Meanwhile, round the bend, the pointwork salvaged from defunct lines is being relaid at the end of Cumberland Road.
The self-propelled crane was in the process of bringing rail down from the junction….

IMG_2777

IMG_2778

… allowing the track layout to take shape before rain stopped play for the day. The area in the foreground is planned to become the entrance to the rebuilt ‘barn’ building.

IMG_2781