All change at Butterfly Junction

The track gangs (Usually a team of no more than 6 people) have been extremely busy in modifying the layout at Butterfly Junction.

This was the view today – the line through the station has been lifted, as has the loop, and the sleepers from the Ashton Meadows Spur have been recovered.

Perhaps aptly, the station information board is rather lopsided.
IMG_3093

In the shadow of the tobacco bond warehouses, the crane lifts the last few remaining rails from the station area.
IMG_3092

Larry the loader assists
IMG_3090

The foreground is where the spur to Ashton Meadows used to run – this is planned to form part of the Metrobus route
IMG_3089

Just around the corner, the new shed and yard is taking shape. Compare these photos to those taken in January, another set of points has been laid on the approach to the Barn, which is already half assembled.

IMG_3082

IMG_3083

IMG_3084

IMG_3085

IMG_3086

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s