Last Operating Weekend of 2014

This Saturday and Sunday are the last two days of operation on the BHR for the 2014 season, and possibly the last services to travel to Butterfly Junction in its present form before the remodelling in anticipation of the Metrobus route construction.

Come down and take a ride!

Advertisements

Butterfly Junction Update – March 2014

20140325-210511.jpg

20140325-210309.jpg

The single line is now relaid at Butterfly Junction for retaining access to the Smeaton Road shed.

20140325-210707.jpg

20140325-210732.jpg
Ashton Avenue Bridge is now severed.

Meanwhile, the Barn Yard takes shape. Both shed roads are nearly laid, as well as the line running around the back of the shed.

20140325-211203.jpg

20140325-211221.jpg

20140325-211241.jpg

All change at Butterfly Junction

The track gangs (Usually a team of no more than 6 people) have been extremely busy in modifying the layout at Butterfly Junction.

This was the view today – the line through the station has been lifted, as has the loop, and the sleepers from the Ashton Meadows Spur have been recovered.

Perhaps aptly, the station information board is rather lopsided.
IMG_3093

In the shadow of the tobacco bond warehouses, the crane lifts the last few remaining rails from the station area.
IMG_3092

Larry the loader assists
IMG_3090

The foreground is where the spur to Ashton Meadows used to run – this is planned to form part of the Metrobus route
IMG_3089

Just around the corner, the new shed and yard is taking shape. Compare these photos to those taken in January, another set of points has been laid on the approach to the Barn, which is already half assembled.

IMG_3082

IMG_3083

IMG_3084

IMG_3085

IMG_3086