Winter Progress, or ‘Where’s the Point?’

Down at Butterfly Junction on a windy January day, the simplification of the track layout has seen the point to Ashton Swing Bridge removed…

IMG_2769

IMG_2770

IMG_2771

IMG_2773

Meanwhile, round the bend, the pointwork salvaged from defunct lines is being relaid at the end of Cumberland Road.
The self-propelled crane was in the process of bringing rail down from the junction….

IMG_2777

IMG_2778

… allowing the track layout to take shape before rain stopped play for the day. The area in the foreground is planned to become the entrance to the rebuilt ‘barn’ building.

IMG_2781

Yard remodelling and site clearance

The Barn has now been dismantled and stored on wagons in the yard, allowing the headshunt to be reconnected to the shed road once more.

IMG_1659

IMG_1660

IMG_1662

Down at A Bond, site clearance has taken place with a view to the proposed remodelling.

IMG_1666

IMG_1667

IMG_1673

The war between the pro and anti bus route campaigners has spilled onto the paths.

IMG_1679

IMG_1677

Finally, a giant lottery ball hit L shed.

IMG_1685

Dismantling ‘The Barn’

A lot can change in a week! There is a hole in the sky as ‘The Barn’ is dismantled. In the current redevelopment plans, the siding on the right will be reconnected to the shed road on the left, forming a loop into the yard again. The stone setts on the right (under the telehandler) are to be replaced with an access road, which will cross both lines roughly where I am standing to take the picture. This will take traffic away from the current choke point around the front of the Olive Shed.