End of the Line

Track lifting is well under way at Butterfly Junction, just the pointwork rails and the sleepers remaining in the station area. These photos also show the vegetation clearance that has taken place.

Ashton Avenue Bridge is now closed for refurbishment, along with the former trackbed. No doubt the rails still on the bridge will be coming out shortly.

A different scene over at SS Great Britain Halt, where the buffer stop has been moved from the end of the line here. I believe that this is to be used as the basis for a small shed, which should come in useful if the branch along the New Cut is closed while MetroBus is under construction.

Advertisements

One thought on “End of the Line

  1. Have a look on Planning Online Bristol application 15/05486/F to see the plans for the shed. Comments about the plans welcome, particularly supportive ones!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s