Work on Henbury’s 10 year overhaul is progressing well.

The boiler has now been lifted from the frames (courtesy of Crane 32 with shunting assistance from Portbury). The boiler has been placed on a trolley and taken back to the engine shed, while the frames were lifted and turned 90 degrees, then placed on a temporarily-laid piece of track so they could be pushed into the workshop. The cab and other items are also inside.

During certain running days, visitors to M Shed can see work taking place and even make a donation to the overhaul. There are photographs of the boiler lift on display to show the process.

The above sequence shows the lift.

Above: The boiler, cab, frames and tank all separated out.

Meanwhile, Portbury is running the scheduled services. This weekend is the last operating weekend of the season, with trains running from M Shed and alternating down the branch to Vauxhall Bridge and the quayside line to SS Great Britain.

Here are a few shots of Portbury at work last weekend.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s