Henbury, back at work already

Henbury was steamed up this week and put to work straight away, shunting the well wagon and flat loaded with sleepers up the branch. The Coles Crane unloaded all these ‘new to us’ concrete sleepers on to Cumberland Siding.
Just visible in one of the photos is the new lid for the coal wagon. These are to prevent unwanted access, protect the contents of the wagon and are designed to resemble wagon sheets whilst also being sturdy enough to resist the elements in the long term.
Thanks to Chris for these photos.

Volunteers and staff are working hard to get this done on top of regular maintenance. At the same time, the other well wagon was unloaded of redundant and life-expired wooden sleepers. Jobs like this go to show how much the wagon fleet is still needed by the railway to continue operating, so they are not just museum pieces, they are also working items of rolling stock.
This has freed up the two well wagons to receive another two lorry loads of concrete sleepers and chairs in the next few weeks.