Now Portbury’s boiler has been detubed, work moves on to the next job. Today we started the process of removing the wheelsets.
First, the eccentric rods were taken off the centre axle.
Then the brake rodding was dropped out and the brake blocks and hangers removed (fronts have been left on for now until we can move the axle due to clearances on the slide bars).
With all the gubbins out of the way, the process of jacking the loco up can start. 2 hydraulic jacks (one at each end) with 4 screw jacks (one on each corner) and plenty of timber packing. By the end of the day, we had nearly lifted the loco enough to drop the axleboxes out of the hornguides.
The weekday team will be picking things up next.