A few blog posts recently have covered the acquisition of loads of second-hand concrete sleepers. This is all in aid of bringing the New Cut branch back in to use.
It’ll soon be 10 years since the track was lifted at Butterfly Junction to make way for the Metrobus Guided Busway.

The return was delayed as in early 2020, the ongoing subsidence of the New Cut wall came to a head as the wall, the Chocolate Path and the Railway all collapsed into the Cut.


The wall has since been fixed, but then came the refurbishment of Vauxhall Bridge (halfway down the branch) which requires a large amount of scaffolding blocking the track.

The current railhead at the new section of wall, with a fenced-off Vauxhall Bridge in the background.

The aim is to be ready to commence tracklaying and sleeper replacement as soon as possible, to return trains to the station at ‘A’ Bond warehouse.
To this end, volunteers and staff, along with Larry the trusty loader, have been working down at A Bond to position the platform and track, sort through the materials and work out what is re-usable and what needs refurbishment. Hauling track out of the undergrowth is part of the challenge!
The platform has been shot-blasted and repainted to protect it.
Thanks to Chris and Katie for these photos.

Hopefully this work shows a statement of intent to the public that the branch is on its way back.

Back on the Wharf, a huge amount of hedge trimming and lineside clearance has taken place along the curve to Cumberland Road Bridge, requiring use of the Coles Crane and cage, seen here returning to the shed at the end of a running day.

The next step was the clearance of the ash pile next to the pit, which was getting rather tall. This required use of the grab and the Vincent wagon. The ashes are being used to create a walking route for trackworkers and shunters alongside the running line, where there was previously very limited clearance. Ash paths were a staple of the steam-era railway environment as there was so much of it around. More sorting and moving of sleepers and chairs was also done. The crane’s new clear acrylic roof and windscreen are very useful for this work.

More to come as work progresses….

Riverbank Subsidence and Repairs

The phrase ‘ship shape and Bristol fashion’ refers to the high tidal reach of the River Avon in Bristol, where ships would have to be strong to withstand being on the riverbed every 4 hours.
During the harsh tides this spring, the banks of the New Cut between Vauxhall Bridge and the Create Centre sagged a bit, requiring this section to be closed while repairs were carried out.

This photo shows the ‘sag’ in the track.
IMG_3734

The rails in this section were duly lifted, and the sleepers repositioned to form a ramp for construction equipment to get in.