That’s it! Another season of passenger operations finished. Now the winter maintenance can begin.






This includes getting the tank of the Sulphiric Acid Tanker rubbed down and repainted. The chassis is still in good condition but the tank has suffered a bit from flaking paint and rust bubbles.
The Coles Crane was used to bring the tanker out of the yard and set it down on to Henbury at the end of the working day. The steam loco then propelled it onto the quayside to be pressure-washed. Earlier in the day we did a test lift to ensure the crane would be able to slew it into the warehouse.






Henbury was then ashed out (the plates in the ashpan were removed at the same time) and taken back to the shed as the light faded.





Thanks to Katie Richards for the photos.