We’re Going Back up the Branch! (II)

Thankfully we have been lucky with the weather recently and have done more work on repairing and rebuilding the branch to A Bond.

EVEN MORE concrete sleepers have arrived and were stashed on wagons. These deliveries have almost finished now with enough in stock to relay the majority of the running line. Bob caught these photos of Crane 32 doing the honours with Henbury ready to tow them away.

A thankless task has been moving the stacks of concrete sleepers which were left on the trackbed in the new station area. The contractors employed to fix the wall of the New Cut and the Chocolate Path were meant to have installed these in ‘the gap’ but for some reason this was not done before the work site was cleared. We need to re-grade this area due to the height difference in the old running line and the new yard area, so the laborious work of moving all the sleepers had to be done by Larry and a few volunteers. Frustrating, but necessary to allow work to continue.
Chris cleared the last few earlier last week leaving the platform road clear.

At the weekend we were then able to drag another 30-foot rail into position at the railhead and begin to hammer keys into every other rail chair to give the track some rigidity. Then, using a turfer ratchet chain thingy we slewed the 60-foot panel to begin making a gently curve towards the station.
The view at the end of the day shows the new curve as well as the height discrepancy between the new track and the old. The old railhead will need jacking up and re-packing underneath once it’s been connected to the new panel.

Have-A-Go Week, 29’s Overhaul, A New Pontoon and a Spot of Gardening

HAVE-A-GO!
Last week (13-17th October) was ‘Have-a-Go’, where people can book a session of 20 minutes 1-on-1 tuition on driving the steam locomotive on the quayside as well as 20 minutes of driving the electric crane. We don’t know of anywhere else in the UK that does this combination so it’s a fun experience. Happy to report that this week was a sell-out success!
Thanks to Bob Edwardes and Paul Stanford (who got the experience as a wedding anniversary gift, lucky!) for these photos. Paul is a lifelong railway worker who has written extensively about the railways of Bristol and the South-West. His latest book, From Chocolate to Cider charts over 180 years of family railway history.

A NEW PONTOON AND A SPOT OF GARDENING
Two large concrete pontoons have been a regular feature of the harbourside for decades. One of them formerly had a boathouse atop it. More recently, The Matthew has been using a pontoon for safe loading and mooring of their ship, whilst the other was repurposed as a community garden. The latter has fallen out of use (especially since Covid) and is now to begin a new life at M Shed. The ability to load boat trips at deck-height, coupled with no longer needing to raise and lower the gangplank steps for every sailing, will be a great help.
Bob Edwardes and James Stanley captured the Harbour Master’s boats bringing the pontoon to its new home on 8th October. Note that the derricks were cut off to enable it to pass under Bristol Bridge and Redcliffe Bridge.

There is A LOT of soil on this pontoon, which is no longer needed. Some of this will be re-used in a project at SS Great Britain platform. Since the points leading to the defunct double-track section were taken out some years ago, a lot of people have been using the trackbed as a shortcut or dog-walking area. This isn’t ideal when there are trains departing the station (trip hazards etc.) so a raised bed is being constructed from surplus sleepers and timbers.
The first steps were made here during an operating weekend, with the crane and Larry bringing supplies over for the volunteers to work on.

29’S OVERHAUL

Crane 29 has been a long-term restoration project, having been something of a parts donor to get the others running again in the early 2000s. Bruce and the crane gang have been working hard to get it back into use.
Recently this involved some close-up work on the bearings and jib, for which the man-cage was a great help, Crane 30 doing the honours. As you can imagine this job requires a calm day with very little wind, quite unlike what we experienced over Docks Heritage Weekend!

Docks Heritage Weekend 2025

On 4th and 5th October, M Shed hosted Docks Heritage Weekend (one of my favourite events of the year) with the support of Bristol Port Company and the Show of Strength Theatre Company.
This is the time when we bring the quayside back to life and give a flavour of what a working port looked like in the 1950s.
Featuring cranes lifting appropriate loads, the capstan in operation, boat trips, and this year we re-jigged things a little so that the steam engine was part of the quayside demonstrations as it shunted wagons around.
The Bristol lorry suffered a leaking radiator hose on Sunday morning which will need repairing, so Henbury did a bit more shunting on the second day. The freshly-painted MOGO van took pride of place.
The storyline of Mr. and Mrs. Purnell this year revolved around their tin wedding anniversary and involved a mop bucket and a tin of beans!
Thanks to Bob Edwardes and Adam White for taking some of these photos.

MOGO – Out in Time for Docks Heritage Weekend!

Looking very shiny on the quayside today was the freshly-painted GWR MOGO van, in the nick of time for Docks Heritage Weekend this Saturday and Sunday!
The volunteers have been working flat-out the past few weeks to get the van stripped, re-clad in new marine ply and primed, then painted. Some touching-up and signwriting still to do but it is looking excellent.
Compare this to the rather sorry state it was in earlier this year:

Here’s some photos from last weekend with normal train running at the same time as work went on inside L Shed:

As above, don’t forget it’s Docks Heritage Weekend on the quayside, with cranes, capstan, boats and the steam locomotive all in use with support from the Show of Strength Theatre Company.
It’s one of the best events of the year at the museum!

More MOGO overhaul progress

Volunteers have been beavering away on the GWR MOGO van with the intention of getting it back on the quayside in time for Docks Heritage Weekend in October.
High quality marine ply has been purchased to replace the knackered old timbers. This has been cut and test-fitted to the van to drill bolt holes, then will be removed, sealed, primed and refitted for painting.
Thanks to Bob for the images

Bringing Back the Branch

A few blog posts recently have covered the acquisition of loads of second-hand concrete sleepers. This is all in aid of bringing the New Cut branch back in to use.
It’ll soon be 10 years since the track was lifted at Butterfly Junction to make way for the Metrobus Guided Busway.

The return was delayed as in early 2020, the ongoing subsidence of the New Cut wall came to a head as the wall, the Chocolate Path and the Railway all collapsed into the Cut.


The wall has since been fixed, but then came the refurbishment of Vauxhall Bridge (halfway down the branch) which requires a large amount of scaffolding blocking the track.

The current railhead at the new section of wall, with a fenced-off Vauxhall Bridge in the background.

The aim is to be ready to commence tracklaying and sleeper replacement as soon as possible, to return trains to the station at ‘A’ Bond warehouse.
To this end, volunteers and staff, along with Larry the trusty loader, have been working down at A Bond to position the platform and track, sort through the materials and work out what is re-usable and what needs refurbishment. Hauling track out of the undergrowth is part of the challenge!
The platform has been shot-blasted and repainted to protect it.
Thanks to Chris and Katie for these photos.

Hopefully this work shows a statement of intent to the public that the branch is on its way back.

Back on the Wharf, a huge amount of hedge trimming and lineside clearance has taken place along the curve to Cumberland Road Bridge, requiring use of the Coles Crane and cage, seen here returning to the shed at the end of a running day.

The next step was the clearance of the ash pile next to the pit, which was getting rather tall. This required use of the grab and the Vincent wagon. The ashes are being used to create a walking route for trackworkers and shunters alongside the running line, where there was previously very limited clearance. Ash paths were a staple of the steam-era railway environment as there was so much of it around. More sorting and moving of sleepers and chairs was also done. The crane’s new clear acrylic roof and windscreen are very useful for this work.

More to come as work progresses….

Harbour Festival 2025

Harbour Fest was held on 19th and 20th July this year, as always it was a packed event with lots of visitors. The crowds mean taking additional safety measures such as volunteers on crowd control duty. Always a busy time but no mishaps, thanks to the volunteers and staff of the Working Exhibits.
Saturday night saw a BBQ for the workers, held aboard John King.
Pyronaut unfortunately sustained some damage due to another vessel. She required some emergency repairs to the handrails to be able to take part in the celebrations.
A particular highlight was the attendance by replica tall ship Galéon Andalucia. Very impressive!

Thanks to Katie, Dave and Bob for the photos!

Pannier and Brake Van Photos

A few operating weekends have passed with Henbury, but today we are looking back to when GWR No. 1369 visited. Paul Stanford sent in these photos of 1369 working on the brake van specials down the branch. Thanks Paul!
It’s not often that we get enthusiast photos from the New Cut branch so it’s great to be able to share them here.

YouTube user ‘Bovine of the Rails’ took these clips from that day:

‘Heritage in the 21st Century’ shared these clips from the photo charters run by 30742 Charters:

Henbury Pulling Passengers in the Port

Youtube channel brunelheritage was on hand to record Henbury’s first day back in service. The sun shone for most of the weekend and passenger numbers were strong on both the train and ‘Pyronaut’, the museum’s fire-fighting boat giving tours around the harbour

More trackwork and first running weekend of the year

Last weekend more preparation for the relaying of the New Cut branch to A Bond warehouse took place along with track maintenance ahead of the first running weekend of the year this coming Saturday and Sunday.

The sleepers were unloaded on to one of the flat wagons earlier in the week. The Coles Crane was to be used but needed to be on the East side of the wagon, so Larry was used to push the truck up the quayside and enable the Coles to couple up. The Coles then propelled the wagon up the branch to the siding alongside Cumberland Road bridge.

We put our cargo handling and crane direction training as seen at Docks Heritage Weekend to good use. Using the brothers (dual chain hooks) enables 2 sleepers to be loaded at a time and stacked neatly on the siding.

With that done and the wagon returned to the yard, in the afternoon the team were jacking and packing sleepers on the running line by the steam crane, as well as slewing the rails to ease the curve either side of the rail join. This required multiple jacks and a lot of sweat!

HENBURY will be in steam tomorrow morning so come on down and enjoy a train ride in the sunshine.