TBT – GWR 813 in Bristol

Another Throwback Thursday to 29th July 2001, when GWR 813 was visiting Bristol. This locomotive has just celebrated its centenary, having been built in June 1901.

You can learn more about GWR 813 and if you like, contribute to the upkeep of this lovely locomotive at http://www.gwr813.org/

Credit for these photos goes to K R Bayley, with huge thanks to Nick Baxter for sending them to me.

New year, new developments

This shot from Vauxhall Bridge shows that the majority of the fencing between Cumberland Road and the railway line has been removed. This is to be replaced and strengthened to prevent a metrobus going through the fence in the event of a collision.

IMG_3964

Down at Sugar Quay/Whapping Wharf, the first phase of the new housing is nearly completed. This features a walkway that connect Gaol Ferry Bridge to Museum Square.

IMG_3972

Conflat Maintenance – 1

The small open passenger wagon, based on a ‘Conflat’, is currently outside the workshop for some maintenance.

The advantage of basing this vehicle on a container wagon is that the whole passenger ‘tub’ can be lifted off, making access easier. Another flat wagon has been brought up to accommodate the tub. It’s handy having huge cranes about the place!

End of the Season

Well, that’s the end of the 2015 operating season on the BHR. Plenty of exciting updates to come, with the ongoing metrobus and Whapping Wharf/Sugar Quay developments, and M Shed’s own projects.

Here’s a photo of a scene that won’t be repeated again, the old Butterfly Junction halt with ‘Judy’ on the passenger train.

Photo courtesy Tim Symons

Photo courtesy Tim Symons

 

Cranes and Boats and Trains

The last operating weekend of the season is this coming Saturday and Sunday on the BHR, before the winter shut down begins. M Shed museum will be open as normal.

The steam tug Mayflower will also be giving rides.

One of the electric cranes is open to visitors from 11am-4pm today, if you want to go up in the cab and see the controls!

 

Butterfly Junction Redevelopment – 2

Screen Shot 2015-10-23 at 12.28.17

The above diagram (available via the MetroBus website) shows the intentional junction for the guided busway with Cumberland Road, and the re-routing of the harbour railway as a result. The large sweeping curve into Butterfly Junction is gone and replaced with a halt alongside the Bond Warehouse, whilst the ‘Barn’ is retained.

This was the view this morning, the platform in the final stages of removal, and the pointwork rails removed.

IMG_2527

The track has been removed as far as the foot crossing to the chocolate path.

IMG_2528 IMG_2529

End of the Line

Track lifting is well under way at Butterfly Junction, just the pointwork rails and the sleepers remaining in the station area. These photos also show the vegetation clearance that has taken place.

Ashton Avenue Bridge is now closed for refurbishment, along with the former trackbed. No doubt the rails still on the bridge will be coming out shortly.

A different scene over at SS Great Britain Halt, where the buffer stop has been moved from the end of the line here. I believe that this is to be used as the basis for a small shed, which should come in useful if the branch along the New Cut is closed while MetroBus is under construction.