Bristol Metrobus – Revised Plans

The Government has approved Bristol’s rapid transit Metrobus scheme, as reported by the BBC here:
http://www.bbc.co.uk/news/uk-england-bristol-24835593

Previously, the plans called for the railway line along the New Cut to be rebuilt into a combined busway and railway. This route has now been amended so that buses will use Cumberland Road, and will not run along the harbourside.
The current plans envisage a remodelling of the railway near the Create Centre to accommodate the busway as it crosses a rebuilt Ashton Avenue Bridge. The plans have the busway utilise the current railway alignment in order to join Cumberland Road on the level, with the railway being re-aligned.

Details of the plans (Including the amended route) are available on the Metrobus website:
http://www.travelwest.info/node/526

Here is a plan of the proposed works. Please note that the revised route for the BHR is not shown, as it is yet to be decided.

A-Bond-Metrobus-Plan-Nov2013

Bristol Harbour Festival 2013

Harbour Festival is always busy down at Bristol Docks. I was volunteering on the Sunday (Saturday had seen torrential downpours, we were lucky on Sunday).

A couple of views from 8am before the crowds arrived.
IMG_0871

IMG_0872

IMG_0874

The ever faithful ‘Henbury’ was on duty today.

As steam was raised outside the shed, I was tasked with polishing up some of the brasswork, including climbing up on the saddle tank to do the whistles, safety valve cover and chimney cap.

IMG_0873

IMG_0875

IMG_0876

Then Driver Bob eases her over the pit for oiling.

IMG_0877

IMG_0878

IMG_0879

The harbour area was packed full of interesting vessels and activities, and the museum’s own fleet was out in force.

IMG_0881

IMG_0884

IMG_0885

IMG_0887

IMG_0891

IMG_0890

The main challenge of the day was traversing the extremely busy area on the wharf. Trains proceeded along this section at a snail’s pace. Museum volunteers in high-vis made sure members of the public didn’t stray on to the running line.

IMG_0888

IMG_0889

Services were between M Shed and the SS Great Britain halt. The rain did eventually come, thankfully only toward the end of the day.
‘Henbury’s fire was dropped and she backed into the shed after another day’s work.

IMG_0903

henbury-backs-into-shed-500_zps8e7ab8a7